Pick, pack & dispatch โ Summary
Warehouse & Dispatch ยท Dispatch Supervisor ยท Runs daily91% complete
5 waiting for a decision
- SimplifyWave-picking by zone (step 2)โ 125h/yr ยท ~30m/run
- SimplifyOne booking screen for three carriers (step 4)โ 63h/yr ยท ~15m/run
- SimplifyManifest built from the bookings (step 5)โ 50h/yr ยท ~12m/run
Top friction points
Worst first โ how much a step hurts, multiplied by how long it takes. So a long mildly annoying step can outrank a short painful one.
| Step | Who does it | Kind of pain | Hurts | Time | Why it hurts |
|---|---|---|---|---|---|
| Rank 1, step 4, Book couriers across the three carrier portals | Dispatch Supervisor | โ | a lot | 20m | Three logins, three interfaces, same data keyed into each |
Recommendations
Start here
The biggest wins your team can start without waiting on anyone.
Manifest built from the bookings
Step 5 ยท needs setting up ยท ~12m/run
Pick lists allocated and sent on their own
Step 1 ยท needs setting up ยท ~8m/run
Tracking numbers sent back automatically
Step 6 ยท needs setting up ยท ~8m/run
๐ง Change how these are done (5)~73m/run
Wave-picking by zone
~30m per run of the step's 270m team time
How โพ
Three people walk the whole floor for every order. A build groups the day's orders into waves and gives each picker a route through one zone, so the same orders are picked with less walking. The floor layout and the wave times are agreed with the warehouse team first.
One booking screen for three carriers
~15m per run of the step's 20m
How โพ
The same consignment data is keyed into three courier portals. A build takes the day's manifest once and books all three via their APIs, returning labels together.
Manifest built from the bookings
~12m per run of the step's 15m
How โพ
Once the couriers are booked in one place, the manifest already exists. A build assembles it per carrier and prints it for the drivers, so the supervisor checks it instead of compiling it.
Pick lists allocated and sent on their own
~8m per run of the step's 10m
How โพ
The 6am order batch is already in the ERP. A build splits it into pick lists by zone and sends each list to the picker's handheld, so the supervisor stops printing and allocating by hand and only steps in when stock runs short.
Tracking numbers sent back automatically
~8m per run of the step's 10m
How โพ
The courier labels carry the tracking numbers. A build posts each one to the online store as the label prints, so nobody copies them across at the end of the day.
None
None
Manual hand-offs between systems
- 5 โ 6Data moves from Courier portals to Ecommerce platform by hand here.
- 6 โ 7Data moves from Ecommerce platform to Courier portals by hand here.
Worked out from the systems named on each step, so check it against how the work really goes. No time or cost is counted for these.